Production scheduling optimization



Academic coordinator | Víctor Blanco, University of Granada


Business coordinator | Tamara Borreguero, Airbus Defence And Space



Description | At Tablada Plant, several aircraft aerostructures are manufactured. For one of the aerostructures we must deliver four different versions. Each version has a specific demand and therefore, an associated production rate. At the same time, the four of them share the same assembly line. This includes sharing the platforms and jigs. Some platforms are specific per version and others are used by all of them.
The aim is to develop a method that can provide us with a detailed production plan. A successful plan must meet the client demand, take into account the platforms' capacity and minimize the production costs.



 

@108ESGI



It will be held on February, from 17th to 20th in Sevilla.



Register now!